Question 1 of 5

Aquaman’s architect is evaluating a site for a new development and needs to determine the potential for soil erosion. Which of the following soil types should the architect be most concerned about in terms of stability when wet?

A

Gravel

B

Sand

C

Silt

D

Clay

Question 2 of 5

You are in the design development phase of a dream project, where you're designing the new Photography Museum in New York City. You're currently designing the accessible route at the entry and want it to be a statement piece at the facade. What is the maximum slope allowed for an ADA-compliant ramp?

A

1:10

B

1:12

C

1:15

D

1:20

Question 3 of 5

You’re designing a high end custom home for Lil Wayne in New Orleans. Which environmental condition should be considered when selecting building materials for the site?

A

High thermal mass

B

High reflectivity

C

High emissivity

D

High conductivity

Question 4 of 5

Your architecture firm was just awarded a project to design a local concert hall. You’re tasked with developing a preliminary project schedule. What should be included in this schedule?

 

 

A

Site analysis only

B

Design and permitting phases only

C

Design, permitting, and construction phases

D

Construction phase only

Question 5 of 5

Do you want access to exclusive deals, tips, and resources to PASS the ARE 5.0?

A

Yes! I'm ready to be a Licensed Architect! (Make sure to check the subscribe box on the next slide)

B

No, I'm already a Licensed Architect.

Confirm and Submit